Vietin Bank

DSA Engineering provided Mechanical, Electrical, Public Health and Fire Protection engineering services for this mixed-use office, hotel, residential, conference centre and retail scheme.  The buildings incorporate a desiccant dehumidifying system for the outside air supply to the buildings that takes advantage of waste heat from a CHP cogeneration plant to regenerate the desiccant media.

 

Extract air from the office tower is used to cool the occupied zones of the "Green Spine" that runs throughout the project.

 

The project broke ground in October 2010 and shall be completed in 2014.

  • Hanoi, Vietnam
  • Architect: Foster + Partners
  • Project Size: 300,000m²